Enter your keyword

IT Server Room

IT Server Room with Aircon

IN Construction
Investor Name:
NCDC Waste Management Office
Published Date:
July 3, 2015
Location:
Baruni Site, Port Moresby, Papua New Guinea
Value:
Withheld
Architecture:
NCDC Waste Management
About Project
  • Description: The IT Server Room project aimed to create a secure and climate-controlled environment to house the critical IT servers for the NCDC Waste Management Office located at Baruni Site. The project involved erecting steel frames and constructing a dedicated room equipped with air conditioning to ensure optimal operating conditions for the servers. The majority of the construction work was completed onsite, allowing for efficient installation within a condensed timeframe of 3 weeks.

 

  • Technologies/Innovations: Utilization of durable materials and advanced construction techniques to ensure structural integrity and thermal insulation. Implementation of climate control measures, including air conditioning systems, to maintain stable temperatures and humidity levels within the server room.

 

  • Services Provided: Design, construction, and installation of the IT Server Room, including steel frame erection, wall construction, air conditioning installation, and electrical fittings.

 

  • Key Achievements: Completed the project within an expedited timeline of 3 weeks while meeting all client requirements and quality standards. The efficient onsite construction approach minimized disruptions and allowed for swift installation of the IT Server Room, ensuring reliable operation of the IT servers for the NCDC Waste Management Office.